Document Review

How SUNFULL helps buyers verify compliance

Different projects require different documents. Before shipment, buyers should confirm whether the certificate scope, model name, connector type, grid standard, enclosure rating and label information match the ordered configuration.

EV Chargers

Common checks include CE, IEC 61851, connector standard, OCPP requirement, enclosure rating, meter accuracy, payment module and local installation rules.

Battery Storage

Common checks include battery chemistry, BMS protection, transport classification, cabinet design, communication protocol, inverter matching and fire-safety notes.

Hybrid Inverters

Common checks include grid code, phase type, MPPT range, battery voltage, protection design, monitoring method and installation environment.

RFQ Documents

For a clean quote, send destination country, installation type, required certificate, quantity, label language, delivery term and any tender document checklist.

Evidence Boundary

Separate company systems, product files and local approvals

A document is useful only when its owner, scope, model and current validity match the procurement decision.

Company management systems

ISO 9001, ISO 14001 and ISO 45001 relate to the named organization's management-system scope. They do not by themselves certify an individual charger model.

Product compliance files

Match declarations, certificates and test reports to the exact model, input/output rating, connector, enclosure and configuration shown in the quotation.

Destination-market requirements

Importer, operator, installer, utility or local authority obligations remain separate. Confirm who owns registration, permitting, grid approval and site inspection before order.

Verification record

Record the document title, issuer, number, issue and expiry dates, covered model list and any public verification path in the procurement file.

Certificate Gallery

Reference certificates

These images are reference materials. For a project quotation, request the exact certificate file and model scope for the product you plan to order.

ISO 9001

ISO 9001

Quality management reference.

ISO 14001

ISO 14001

Environmental management reference.

EV charger LVD

EV Charger LVD

Low voltage safety reference.

EV charger EMC

EV Charger EMC

Electromagnetic compatibility reference.

IEC 61727

IEC 61727

Grid-connected PV system reference.

NRS 097

NRS 097

South Africa grid compliance reference.

Before Order

Four checks for the document package

1. Identify the exact model

Use the same model code, rated voltage, power, connector and options in the quotation, datasheet, nameplate and compliance file.

2. Request the complete file

Ask for the readable document rather than relying on a gallery thumbnail. Confirm pages, annexes, covered standards and any model list.

3. Verify issuer and validity

Check the issuing body, certificate or report number, issue date, expiry date where applicable, and available issuer verification method.

4. Assign local responsibility

State who handles import registration, utility review, installation design, inspection and any destination-market approval not included in factory supply.

Need certificate scope for a model?

Send the model, destination market and target quantity. We will confirm available documents and the right configuration for your RFQ.

Request Documents