Commercial Container BESS
LiFePO4 · BMS + EMS · Fire Suppression · CE/IEC 62619 · Custom Capacity
Why Choose SUNFULL 100-500kWh Industrial BESS?
- ✓100kWh to 500kWh per container, scalable to MWh
- ✓LiFePO4 cells — thermal stability and 6,000+ cycle life
- ✓Complete BMS + EMS — grid-ready, no extra SCADA needed
- ✓Fire suppression, gas detection, active thermal management
- ✓CE, IEC 62619, UN38.3, ISO 9001 certified
- ✓5-10 year system warranty with performance guarantee
Quick Overview
| Power | 100-500 kWh |
|---|---|
| Markets | EU, Germany, Netherlands, South Africa |
| Certifications | CE, IEC 62619, UN38.3, ISO 9001 |
| Quote | Request tailored factory quote |
| Lead Time | 15-25 days |
Factory-Direct from Wuhan, China
Wuhan SUNFULL NEW ENERGY operates its own EV charger and energy storage manufacturing workflow, covering engineering review, incoming inspection, assembly, functional testing, export packing and documentation support for overseas B2B buyers.
Frequently Asked Questions
Q: Can you customize the capacity above 500kWh?
Yes. We deliver multi-container systems up to 10MWh. Engineering consultation and site survey support provided for projects over 1MWh.
Q: What is included in the container system?
Battery modules, BMS, EMS, fire suppression, HVAC, busbar, AC/DC breakers, and monitoring system. Ready to connect to inverter or grid.
Q: What is the lead time for a 500kWh system?
45-60 days from PO confirmation for standard configurations. Custom configurations may require 75-90 days.
How to evaluate Home before ordering
This guide is for commercial storage, solar-plus-storage and backup-power procurement teams. It gives buyers a practical checklist before comparing suppliers, requesting samples or preparing a project quote.
1. Confirm the operating scenario
Start with the project conditions rather than the product name alone. For EV charging and energy storage, buyers should confirm the daily energy demand, available charging or discharge window, grid voltage, protection requirements, mounting location, communication method and expected user behavior. These details decide whether the selected configuration will remain reliable after installation.
2. Request the right compliance files
Ask for documentation before price negotiation is finished. For this product family, important checks include cell chemistry, BMS protections, PCS matching, fire-protection design, cycle-life assumptions, UN38.3/MSDS files and shipping documents. SUNFULL can prepare datasheets, product photos, wiring notes, packing information and export documents for review before a sample order or distributor batch is released.
3. Compare the full supply scope
Do not compare only headline quote ranges. Confirm what is included in the offer: firmware version, warranty term, spare parts, packaging strength, logo or label work, delivery port, lead time, test report and after-sales contact. A clear scope reduces rework when the first shipment reaches the installer or local partner.
What to send with your RFQ
For a faster quotation, send the destination country, target application, expected quantity, preferred connector or battery configuration, local certification needs, branding requirements, installation environment and delivery timeline. If the site is still at concept stage, a short description is enough: vehicle type, parking or storage hours, transformer capacity, solar input if any, and the commercial goal of the project.
For sample orders, the buyer normally verifies installation fit, communication stability, enclosure quality, display language, packing protection and basic user operation. For batch orders, the review should go deeper: firmware version control, serial-number tracking, spare-parts list, packaging marks, carton drop protection, inspection photos and responsibility for after-sales communication.
For distributor or OEM programs, the first decision is usually not the final price. It is whether the supplier can keep the same configuration across repeat orders, provide stable documentation for customs or tenders, and respond quickly when an installer needs wiring or software support. That is why the quote request should include both commercial volume and technical constraints.
SUNFULL NEW ENERGY positions these pages as sourcing references, not only advertising pages. The goal is to help B2B buyers prepare a cleaner RFQ, compare products on real project conditions, and avoid surprises around certificates, grid compatibility, communication protocol, packaging and delivery terms. When a detail is uncertain, our sales engineer can recommend a conservative starting configuration for pilot testing.
Related SUNFULL sourcing resources
Product catalog • Application solutions • Factory workflow • Certificate checks • Buyer insights
Get a Quote for 100-500kWh Industrial BESS
Factory pricing, datasheet, and technical consultation — within 24 hours.