CCS2 is a common choice for DC fast charging projects in Europe and many export markets, but a CCS2 request still needs clear power, connector, cable, backend and document requirements. A connector name alone is not enough for a useful quotation.

Send Your CCS2 DC Charger RFQ

Tell the supplier whether the charger is for a single site, distributor stock, fleet depot or public charging network.

Power60kW / 120kW / 150kW / 300kW
ConnectorSingle or dual CCS2
BackendOCPP / CSMS / payment
MarketEurope / Middle East / Africa / Asia
DC Fast Charger Manufacturer

CCS2 buying checklist

AreaWhat to confirmWhy it matters
Power60kW, 120kW, 150kW or higher-power DCPower level should match dwell time, vehicle demand and grid capacity.
Connector countSingle CCS2, dual CCS2, or CCS2 plus another connectorConnector layout affects power sharing and vehicle compatibility.
CableCable length, cooling need, holder position and parking layoutCable handling influences user experience and maintenance.
OCPPProtocol version, CSMS, RFID, QR or POS paymentPublic charging sites need tested network operation.
DocumentsDatasheet, manual, model certificate, label and test file scopeImporters and tenders often need model-level documentation.

Before you choose the lowest price

  • Confirm whether the quoted cable, RFID reader, modem, payment interface and OCPP function are included.
  • Ask whether the CCS2 charger can be tested with your backend before shipment.
  • Check spare parts, warranty responsibility and remote support process.
  • Review input voltage, protection level and installation environment.
  • Compare sample cost and batch price under the same Incoterm.

What should buyers confirm before ordering CCS2 DC fast chargers?

A CCS2 DC fast charger RFQ should define vehicle compatibility, power level, connector count, payment workflow and documentation scope. CCS2 is common for European and many international DC charging projects, but the correct model still depends on site power, simultaneous charging needs, OCPP backend, cable length, cooling, display language, CE documentation, installation environment and whether the buyer needs distributor branding or project tender files.

Buyer decision table

ChoiceBest fitBuyer note
60kW to 80kW CCS2Urban parking, small fleet, retail and moderate turnoverLower grid requirement and easier site entry.
120kW to 150kW CCS2Highway, public charging, fleet depot and commercial stationsCommon project range for faster sessions and stronger station positioning.
200kW+ CCS2/HPCHigh-traffic stations, truck planning and premium corridorsRequires stronger grid, cable planning and utilization assumptions.

RFQ checklist buyers should send

RFQ itemWhat to confirm
Power and outputTarget kW, voltage range, single or dual gun, simultaneous charging and power sharing.
ConnectorCCS2 cable length, cable management, CHAdeMO/GB/T option if needed.
SoftwareOCPP version, CSMS provider, RFID, QR, POS and remote diagnostics.
DocumentationDatasheet, CE scope, EMC/safety notes, manual, packing and HS code support.
Site detailsCountry, grid input, indoor/outdoor, IP rating, parking layout and quantity.

Buyer mistake to avoid

Do not ask only for a CCS2 charger price. Without power level, OCPP, payment and site information, suppliers cannot quote a practical station configuration.

What makes a CCS2 quotation reliable

A reliable CCS2 quotation should show the exact output configuration, not only the cabinet power. Buyers should check whether the charger supports one gun or two guns, how power is shared during simultaneous sessions, whether the voltage range matches the target vehicles, and whether cable length and cable handling fit the site. These details affect user experience, maintenance and installation cost.

Documentation is also part of procurement risk. Importers, EPC contractors and charging operators should request model-matched datasheets, rating label drafts, packing information, CE-related scope where applicable and OCPP test expectations before confirming a batch. If a tender requires payment, RFID, QR, POS or a named CSMS platform, include that in the RFQ so the supplier can confirm compatibility instead of quoting a generic CCS2 fast charger.

For public sites, also confirm screen language, emergency stop placement, network method, warranty response and spare-parts handling. These points are often reviewed after installation, but they should be settled before the charger cabinet is built and packed.

Related SUNFULL buyer pages

Procurement FAQ

Is CCS2 suitable for DC fast charging?+

Yes. CCS2 is a common DC fast charging connector in Europe and many international projects.

Should a CCS2 DC charger have one or two guns?+

It depends on bay layout, expected traffic and whether the operator wants simultaneous charging with power sharing.

What certification files should buyers ask for?+

Ask for datasheet, CE scope, EMC/safety notes, manual and any project-specific compliance documents.

Request CCS2 DC Charger RFQ Review

Send your country, charger type, power, connector, software needs, quantity and timeline. SUNFULL will reply with a practical model path instead of a generic price list.

Send Requirements on WhatsApp