Project Background
The buyer needed a repeatable DC charger configuration for commercial parking sites while keeping the certificate scope, connector selection and backend communication consistent across each shipment.

SUNFULL Approach
- Matched 60-180kW dual-connector chargers to site dwell time and transformer capacity.
- Prepared CE, EMC/LVD, wiring, packing and commissioning documents for the EPC review.
- Kept firmware and cabinet configuration locked for repeat orders to reduce installer retraining.
Result and Buyer Takeaway
The project team received a clear procurement baseline for phased commercial rollout, with configuration, documentation and spare-parts planning aligned before shipment.
RFQ checklist for a similar project
Send destination country, charger power or storage capacity, site type, expected quantity, connector standard, communication protocol, certification needs, branding requirements and target delivery schedule.
Project details SUNFULL needs before recommending AC/DC chargers
For a similar project, a useful RFQ should include the country, site type, available grid capacity, expected vehicles per day, preferred AC/DC charger mix, connector standard, OCPP or payment scope, certification requirements and first-batch quantity.
- Commercial EV charger manufacturer page for parking, hotel, CPO and fleet project scope.
- AC charger page for 7kW, 11kW and 22kW long-dwell charging.
- DC fast charger page for 60kW, 120kW, 150kW and highway/fleet charging.
- OCPP charger support page when backend, RFID, payment or CSMS integration is required.