Electrical fit
Send nominal voltage, phase, available current, protection concept, cable route and the number of chargers expected to operate together.
Commercial-grade, back-office compatible, energy reporting, IP54
Use this page to confirm fit, documentation needs and OEM scope before requesting a project quote from SUNFULL.
Choose wall-mounted or pedestal installation around the parking layout and available three-phase supply.
Specify optional OCPP 1.6J, the target CSMS and the required network connection for your project.
Discuss product labels, packaging and manual language for your distributor or charging-service program.
An 11kW OCPP wallbox is normally evaluated for three-phase, long-dwell workplace, apartment, hotel and fleet parking. The buyer should confirm both the electrical fit and the exact CSMS workflow; an OCPP label alone does not define every remote command, meter value, offline rule or security setting required by an operator.
Confirm three-phase voltage, current per phase, site demand limit and the vehicle's onboard AC charging capability before selecting 11kW.
Name the target CSMS and the functions that must pass acceptance, such as authorization, session start/stop, meter values, status, remote commands, reset, firmware workflow and offline behavior.
Define RFID, app, network, load-management and tariff responsibilities before approving the sample; these are system choices, not automatic results of the 11kW rating.
Provide site voltage, phase arrangement, current limit, parking duration and vehicle mix.
Share the backend, required OCPP functions, security settings and acceptance test cases.
Define RFID groups, app access, static or dynamic load limits and offline operation.
Freeze firmware, labels, meter option, enclosure, connector and approved sample revision.
For qualified projects, the available model datasheet, wiring and installation guidance, OCPP function mapping, FAT checklist and applicable compliance files can be shared privately after the exact model, backend scope and destination market are confirmed.
| Category | AC Charger |
|---|---|
| Power / Capacity | 11kW |
| Connector / Interface | Type 2 |
| Documentation Scope | Compliance files and applicable standards are confirmed by exact model, configuration and destination market. |
| Evaluation Order | Availability and quantity are confirmed in the current quotation. |
| OEM Terms | Branding scope, MOQ, tooling and approval process are confirmed by model and project. |
| Destination-Market Review | Applicable standards, labels and document package are confirmed before order approval. |
SUNFULL can support logo, label, packaging and manual customization for qualified OEM orders. Compliance files are confirmed by exact model, destination market and selected configuration.
Send the target country, grid standard, connector requirement and expected annual quantity so the sales team can prepare a realistic quote.
For a faster RFQ, include project location, application scenario, quantity, required certification, branding needs and target delivery window.
The SF-EA-11kW combines a 380VAC, 3P+N+PE electrical configuration with RFID access. OCPP 1.6J is an option on this named model, so an OCPP project should identify that selection explicitly alongside the target backend and network arrangement.
| Model | SF-EA-11kW |
|---|---|
| Input voltage / current | 380VAC ±15% / 16A |
| Supply arrangement | 3P+N+PE |
| Dimensions, H × W × D | 300 × 315 × 120mm |
| Display / housing material | 4.3-inch LCD / PC+ASA |
| User access | RFID |
| Network configuration | 4G/LAN; select the connection needed for the target CSMS |
| OCPP | OCPP 1.6J optional; request this configuration for OCPP operation |
| Ingress protection | IP54 |
| Operating environment | −20°C to 50°C; ≤95%RH, non-condensing; altitude <2000m |
| Installation formats | Wall-mounted / pedestal; hardware scope confirmed per order |
No. OCPP 1.6J is an optional configuration for the SF-EA-11kW. For an OCPP order, the quotation should identify the selected option, network method, firmware and target CSMS. Agree the required authorization, session and reporting checks before sample acceptance; the model's power rating does not define those software functions.
Request the SF-EA-11kW OCPP configuration and applicable model files. Send the backend name, required functions, site input and target country so the electrical and software scope can be reviewed together. Detailed technical and compliance files can be exchanged privately for the selected model.
For an 11kW OCPP EV charger project, electrical commissioning and backend acceptance should be agreed before the pilot unit is approved.
Confirm phase, voltage, available current, protection design and the vehicle mix that is expected to use 11kW AC charging.
Name the backend, OCPP version, endpoint, security profile and certificate-handling process required for the approved project.
Write the required RFID, remote-start, offline, meter-value, fault, reset and transaction workflow as an acceptance checklist rather than assuming every backend behaves alike.
Agree which configuration record, test results, firmware reference, installation information and model files will accompany the accepted unit.
Backend acceptance depends on the required message set, network method, security settings and operator workflow. Send the CSMS test account or acceptance document before shipment so supported functions and buyer responsibilities can be recorded for the selected configuration.
Consider 11kW when the site has three-phase supply and the vehicles can use that AC charging rate, but the project does not need a 22kW allocation at each bay. The SF-EA-11kW lists a 16A input, compared with 32A for the SF-EA-22kW. Use the vehicle mix, parking duration and total site capacity to compare the two configurations.
No. The target backend, security settings, required commands, meter data, offline behavior and acceptance tests should be confirmed before batch approval.
Provide site power, vehicle mix, connector, CSMS, required OCPP functions, RFID or app flow, load management, network, quantity, country and document needs.
Tell us your country, quantity and target CSMS if you have one. We can discuss the SF-EA-11kW OCPP configuration, installation format and sample evaluation requirements, then prepare the relevant product information and quotation.
WhatsApp: +86 181 3572 0426
Email: info@sfxntech.com
All fields marked with * are required.
An 11kW EV charger can suit workplace, apartment and fleet parking where three-phase supply and vehicle compatibility are confirmed. Before a sample or batch order, define the target CSMS, OCPP version, authorization flow, network path, meter data, remote commands and failure behavior.
Send nominal voltage, phase, available current, protection concept, cable route and the number of chargers expected to operate together.
Agree a test list covering boot, authorization, start and stop, meter values, alarms, remote reset and recovery with the target CSMS.
Request the datasheet, installation information, protocol scope and applicable model-specific files after the exact configuration and destination are fixed.