Ultra-Fast Charger • Factory Direct • CE Certified

Marine & Port Shore Power EV Charger

Shore-to-ship V2G ready, saline-resistant IP65, port electrification

CE • IP65 • IEC 60309 • OEM/ODM Available
View Full Specs
Factory Quote Support 2-Year Warranty 24h Response Global Shipping
Marine & Port Shore Power EV Charger

Proven Performance

Deployed in 40+ countries, 10,000+ installations. CE, IP65, IEC 60309 certified for global compliance.

🏭

Factory Direct

200-person Wuhan factory. No middlemen. Sample MOQ 1 unit, OEM branding from 50 units.

🌎

Global Shipping

FOB Wuhan, CFR, CIF. Export docs and HS codes handled.

🔐

OEM / ODM Ready

Custom branding, firmware, enclosure. Your brand, our platform.

Marine & Port Shore Power EV Charger

Marine & Port Shore Power EV Charger

Shore-to-ship V2G ready, saline-resistant IP65, port electrification

Quote: Contact us for a tailored factory quote
Certifications: CE, IP65, IEC 60309
Lead Time: 15-25 business days

View Full Specifications →
Procurement Notes

How to evaluate Marine & Port Shore Power EV Charger before ordering

This guide is for Netherlands V2G pilots, port electrification projects and fleet depots. It gives buyers a practical checklist before comparing suppliers, requesting samples or preparing a project quote.

1. Confirm the operating scenario

Start with the project conditions rather than the product name alone. For Ultra, buyers should confirm the daily energy demand, available charging or discharge window, grid voltage, protection requirements, mounting location, communication method and expected user behavior. These details decide whether the selected configuration will remain reliable after installation.

2. Request the right compliance files

Ask for documentation before price negotiation is finished. For this product family, important checks include bidirectional power rating, ISO 15118 roadmap, grid interconnection assumptions, metering, EMS integration and pilot support. SUNFULL can prepare datasheets, product photos, wiring notes, packing information and export documents for review before a sample order or distributor batch is released.

3. Compare the full supply scope

Start from the complete supply scope before requesting a tailored quote. Confirm what is included in the offer: firmware version, warranty term, spare parts, packaging strength, logo or label work, delivery port, lead time, test report and after-sales contact. A clear scope reduces rework when the first shipment reaches the installer or local partner.

What to send with your RFQ

For a faster quotation, send the destination country, target application, expected quantity, preferred connector or battery configuration, local certification needs, branding requirements, installation environment and delivery timeline. If the site is still at concept stage, a short description is enough: vehicle type, parking or storage hours, transformer capacity, solar input if any, and the commercial goal of the project.

For sample orders, the buyer normally verifies installation fit, communication stability, enclosure quality, display language, packing protection and basic user operation. For batch orders, the review should go deeper: firmware version control, serial-number tracking, spare-parts list, packaging marks, carton drop protection, inspection photos and responsibility for after-sales communication.

For distributor or OEM programs, the first decision is usually not the final price. It is whether the supplier can keep the same configuration across repeat orders, provide stable documentation for customs or tenders, and respond quickly when an installer needs wiring or software support. That is why the quote request should include both commercial volume and technical constraints.

SUNFULL NEW ENERGY positions these pages as sourcing references, not only advertising pages. The goal is to help B2B buyers prepare a cleaner RFQ, compare products on real project conditions, and avoid surprises around certificates, grid compatibility, communication protocol, packaging and delivery terms. When a detail is uncertain, our sales engineer can recommend a conservative starting configuration for pilot testing.

Ready to Source Marine & Port Shore Power EV Charger?

Quantity, destination, certification requirements — tell us and we respond within 24 hours.