Employee access
Define card ownership, local or backend authorization, joiner and leaver handling, visitor access and the response when a credential is lost.
Employee card access, usage reporting, cost allocation, OCPP 1.6
Model-specific compliance files, test scope and destination-market requirements are confirmed during RFQ review before order.
Manufacturer-direct support for model selection, project configuration and export-document review. Evaluation-order and OEM terms are confirmed in the current quotation.
FOB Wuhan, CFR, CIF. Export docs and HS codes handled.
Custom branding, firmware, enclosure. Your brand, our platform.
Employee card access, usage reporting, cost allocation, OCPP 1.6
Project Cost: Confirmed after model, configuration, quantity and destination-market review
Documentation: Compliance files confirmed by exact model and destination market
Lead Time: Confirmed after configuration, quantity and document review
7kW Smart EV Charger with OCPP 1.6 + 4G • 22kW Smart EV Charger WLAN + 4G + Bluetooth • 100kW Fleet Charging Station with OCPP 2.0
Browse All 23 Smart Charging Hub Products →This buyer guide is written for parking operators, hotels, apartments, workplaces, distributors and EV charging installers. It turns the product page into a practical sourcing checklist, so a procurement team can compare suppliers by project fit rather than only by headline price.
Start with the real operating conditions: application, installation space, duty cycle, local voltage, grid or battery constraints, expected users, service access and climate. For 22kW Workplace EV Charger with Employee RFID, the key use case is Smart Charging Hub, and the configuration should support Employee card access, usage reporting, cost allocation, OCPP 1.6. If these details are unclear, request a conservative starting configuration before committing to a batch order.
Before price negotiation is finished, ask for the documents that your installer, customs broker or tender team will actually review. Important checks include connector standard, charging power, OCPP version, payment or RFID workflow, enclosure rating, meter accuracy, cable length, installation method and local grid rules. For regulated markets, confirm whether the certificate scope, model name and rating label match the exact configuration being quoted.
Do not compare only the unit price. Confirm whether the quote includes charging cables or guns, pedestal or wall-mount hardware, backend configuration, RFID cards, spare parts, user labels, packing marks and installation documentation. A clear supply scope makes it easier to approve samples, avoid missing accessories, and keep repeat orders consistent across different project phases.
For a faster quotation, send the destination country, target application, expected quantity, preferred configuration, local certification needs, branding requirements, installation environment and delivery timeline. If this is for a tender or distributor program, include the required datasheet format, label language, packing rules and any grid or safety standard requested by the local buyer.
For sample orders, buyers usually verify installation fit, enclosure quality, display or app language, communication stability, packaging protection and basic user operation. For batch orders, the review should go deeper: firmware or hardware version control, serial-number tracking, spare-parts list, inspection photos, carton marks, export documents and the process for technical support after delivery.
For this product family, the current reference offer is US$360-500 with certification notes including CE /OCPP 1.6 — OEM/ODM Available. Treat those figures as a starting point for discussion rather than a final project quotation, because cable length, connector standard, battery configuration, payment module, packaging and destination port can change the final price and lead time.
SUNFULL NEW ENERGY uses these landing pages as sourcing references, not only advertising pages. The goal is to help B2B buyers prepare a cleaner RFQ, compare products on real project conditions, and avoid surprises around certificates, grid compatibility, communication protocol, packaging and delivery terms.
Product catalog • Application solutions • Factory workflow • Certificate checks • Buyer insights
Quantity, destination, certification requirements — tell us and we respond after project-scope review.
Workplace EV charging is most useful when the site connects employee schedules, parking duration, available service capacity, access rules and reporting needs. Workplace EV charging solutions should therefore be compared as a complete operating workflow, not only as a wallbox specification.
Define card ownership, local or backend authorization, joiner and leaver handling, visitor access and the response when a credential is lost.
Set site limits, charger groups, charging windows, priority exceptions and behavior when communications or the backend are unavailable.
List session fields, user grouping, export requirements, tariff ownership and who handles employee questions before approving the software path.