Direct answer
A 60 kW label describes only nominal power. A buyer also needs the output voltage and current envelope, continuous-power and derating behavior, connector and cable configuration, single- or dual-output logic, cooling, protection, metering, OCPP/CSMS scope, payment requirements, service access and project documents. The decisive test is whether the exact configuration can deliver the required energy to the target vehicles at the site—not whether '60 kW' appears on the cabinet.
Read the output envelope before the brochure headline
| Specification | Buyer question | Evidence to request |
|---|---|---|
| Voltage and current range | At which vehicle voltages can rated power be delivered? | Model-specific output curve |
| Port behavior | Is 60 kW available to one connector, or shared between ports? | Power-sharing matrix and test case |
| Continuous duty | What happens at high ambient temperature, altitude or restricted airflow? | Derating curve and thermal test basis |
| Cable system | Which connector, current, length and cooling method are supplied? | Cable and connector datasheet |
Specify the complete station interface
Procurement of 60 kW DC Fast Chargers should be based on the released model and configuration. A connector option, OCPP version or payment feature is not accepted until it appears in the agreed specification and test plan.
- Input voltage, earthing, upstream protection and fault-level assumptions.
- Connector, cable reach, parking layout and accessibility.
- OCPP version, required profiles, security, messages and target CSMS.
- RFID, QR, payment terminal, tariff, receipt and metering requirements where applicable.
- Local language, modem, SIM, remote diagnostics and firmware workflow.
Close the purchase with evidence gates
- Datasheet and deviation list approved before order.
- Model-specific compliance documents checked for the destination market.
- FAT covers protection, output points, metering, HMI, network and required remote actions.
- Packing, drawings, manuals, spare parts and commissioning scope are listed.
- SAT records the vehicle, test conditions, delivered energy and any unresolved issue.
What to confirm before you buy
- Vehicle voltage and charge curve
- Connector and cable length
- Single- or dual-port duty
- Ambient and altitude
- OCPP/CSMS and market document requirements
How to assess SUNFULL's 60 kW project page
SUNFULL publishes a 60 kW CCS2 project page that can be used as a candidate starting point. The active project must still confirm the exact output curve, continuous-duty conditions, connector and cable, OCPP/CSMS functions, cooling method, compliance documents and available commercial terms.
If the target vehicle or market does not fit that configuration, use the wider DC category rather than forcing the candidate into the RFQ.
Options relevant to this question
These links are a starting point, not a claim that every configuration fits every market. Confirm the exact model and project scope before ordering.
DC fast charger range
Use after the required power, connector and architecture are defined.
Project check: category-only; exact model and availability not impliedReview this project path →
CCS2 DC charger procurement checklist
Use only when CCS2 is the confirmed vehicle and destination-market direction.
Project check: buyer guide; not proof of a connector configuration or certificationRead the buyer guide →
OCPP pre-shipment test checklist
Translate network requirements into FAT and interoperability checks.
Project check: educational checklist; not proof that a candidate passedRead the buyer guide →Request the curve and configuration, not only a price
Send the vehicle voltage range, connector, site input, ambient conditions and CSMS requirements. SUNFULL can confirm the candidate configuration and list the documents available at the project stage.
Sources and further reading
- IEC 61851-24:2023 - Digital communication for DC chargingCovers control communication between DC EVSE and the vehicle.
- IEC 61851-21-2:2018 - EMC requirements for off-board charging systemsIdentifies EMC as a separate product evidence scope.
- OCPP Certification ProgramOCPP evidence must be checked by version, product and certification profile.